AU TEMPS DES CERISES
Project Overview
Project Capacity: 19.2 kWp
Location: Tanintharyi Region, Myanmar
Annual Generation: 26 MWh
Annual CO2 emission reduction: 16 Metric ton
Module: Jinko (400W)
Inverter: Growatt (5kW)
If we have to point out one of the most challenging and exciting projects, we can not think better than this project. This off-grid solar system has backup batteries and works together with the diesel generator.